Real-time Analytics
📊 Executive Summary - KATA Program Performance
28
Active Workshops
71.7%
Success Rate
324%
Average ROI
€1.9M
Released Savings
Key Insight: Industrial Engineering department leads in workshop effectiveness with 73.6% realization rate, while Production department generates highest absolute savings at €892K. Cross-functional collaboration opportunities identified to accelerate savings realization across all departments.
Department Performance Matrix
A+
Industrial Engineering
9 workshops • 73.6% rate • €623K realized
A
Logistic
3 workshops • 75.5% rate • €108K realized
A
APS
5 workshops • 72.1% rate • €287K realized
B+
Production
6 workshops • 71.6% rate • €892K realized
C+
Quality
1 workshop • 42.2% rate • €19K realized
C
HSE
1 workshop • 40.0% rate • €10K realized
Completion Trend Analysis
Workshop Completion Over Time Monthly completion rates by department
Savings Realization Pattern
Estimated vs Released Savings Realization rates by category and timeline
Workshop Success Factors
Correlation Analysis Factors contributing to workshop success
Predictive Forecast
6-Month Projection Expected savings and completion rates
Trend Analysis & KPIs
+15%
Completion Rate vs Q3
+247K€
Incremental Savings
3.7 mo
Avg. Cycle Time
-5%
Risk Workshops
Advanced Trend Visualization Multi-dimensional KPI analysis with predictive indicators
AI-Powered Insights
✓
High Performance Pattern
IE workshops with dedicated mentors show 23% higher completion rates and 18% better savings realization.
âš 
Resource Bottleneck
Quality and HSE departments show lower realization rates, suggesting need for additional training or resources.
ℹ
Seasonal Opportunity
Q1 historically shows 12% higher completion rates - plan major initiatives during this period.
📈
Scaling Potential
Current success rate indicates potential to achieve €3.2M annual savings with optimized processes.
Performance Benchmarks
Completion Rate Benchmark
Current 71.7%
Target 85%
Industry Avg 65%
ROI Performance
Current 324%
Target 250%
Industry Avg 180%
Cycle Time
Current 3.7 mo
Target 3.0 mo
Industry Avg 4.5 mo
Employee Engagement
Current 78%
Target 90%
Industry Avg 70%
Automated Report Generation
Executive Summary
High-level KPIs, trends, and strategic insights for leadership
Department Analysis
Detailed performance by department with action recommendations
Financial Impact
ROI analysis, savings tracking, and budget vs actual comparisons
Operational Report
Workshop details, timeline analysis, and process improvements